Showing posts with label PM Modi. Show all posts
Showing posts with label PM Modi. Show all posts

Wednesday, September 8, 2021

Indian Airforce Get 56 C-295 Airbus Transport Aircraft in Make in India deal



The Cabinet Committee on Security, led by Prime Minister Narendra Modi, cleared the long pending Procurement nearly USD 3 billion-deal for procuring 56 Airbus C-295MW transport aircraft for the Indian AirForce (IAF). The aircraft will replace the ageing IAF fleet of Avro 748 transport aircraft that first flew in 1961.

In first of this, 16 aircraft being delivered in flyaway condition from Spain within 48 months of signing of the contract. 

The remaining 48 aircraft will be manufactured in India by the TATA Consortium within 10 years of signing the contract.

This is the first defence contract the European firm Airbus has signed with India since the 1960s despite being in the country for over five decades.

It is also the first project in India in which a military aircraft will be manufactured by a private company.

All 56 aircraft will be installed with the indigenous Electronic Warfare Suite. 

The C-295 is a medium tactical transport aircraft that was designed by the Spanish company CASA in the 1990s as a development of the CASA-Nurtanio CN-235. When CASA was incorporated into the European aeronautical group EADS in 2000, the aircraft was designated as the EADS CASA C-295. It made its first flight on 28 November 1997.

The C-295 is manufactured and assembled in the Airbus Defence and Space facilities in San Pablo Airport, located in Seville, Spain. It is a development of the Spanish–Indonesian transport aircraft CASA/IPTN CN-235, but with a stretched fuselage, 50% more payload capability and new Pratt & Whitney Canada PW127G turboprop engines.

Key Features:-

Crew: 2

Capacity: 73 troops / 48 paratroops / 12 stretcher intensive care medevac / 27 stretcher medevac with 4 medical attendants

Maximum payload: 7,050 kg (15,543 lb) normal
9,250 kg (20,393 lb) overload

Max takeoff weight: 21,000 kg (46,297 lb) normal
23,200 kg (51,147 lb) overload

Maximum landing weight: 20,700 kg (45,636 lb) normal
23,200 kg (51,147 lb) overload

Engines:- 2 × Pratt & Whitney Canada PW127G turboprop engines, 1,972 kW (2,644 hp) each for take-off (normal)
2,177 kW (2,919 hp) with APR

Propellers: 6-bladed Hamilton Sundstrand HS-586F-5, 3.94 m (12 ft 11 in) diameter composite propellers with auto-feathering and synchro-phasing

Others :-

Cruise speed: 482 km/h (300 mph, 260 kn) at optimum altitude

Range: 1,555 km (966 mi) normal payload

Ferry range: 5,000 km (3,100 mi) 

Service ceiling: 4,125 m (13,533 ft) on one engine
Absolute ceiling: 9,145 m (30,003 ft)
g limits: +2.53 (normal MTOW)
+2.25 (overload MTOW)

Take-off run: 844 m (2,769 ft) Sea level, ISA
934 m (3,064 ft) Sea level, ISA + 20
Take-off distance to 15 m (49 ft): 1,025 m (3,363 ft) Sea level, ISA
1,103 m (3,619 ft) Sea level, ISA + 20

Landing run: 420 m (1,378 ft)
Landing distance from 15 m (49 ft): 729 m (2,392 ft)

Weapons & Armament:-
6 Hardpoints (optional: three under each wing) with a capacity of inboard pylons 800 kg (1,764 lb), centre pylons 500 kg (1,102 lb), outboard pylons 300 kg (661 lb)

Radar:-
Honeywell RDR-1400C weather radar
IFR instrumentation, comms and FMS as specified by customers


However, it is yet unclear where the Airbus aircraft will be built, though TATA has an aviation set up in Hyderabad.

Before completion of deliveries, ‘D’ Level servicing facility (MRO) for C-295MW aircraft is scheduled to be set up in India and it is expected that this facility will act as a regional MRO (maintenance, repair and overhaul) hub for various variants of C-295 aircraft, the defence ministry said.

A large number of detail parts, sub-assemblies and major component assemblies of aero structure are scheduled to be manufactured in India. The programme will act as a catalyst in employment generation in the aerospace ecosystem of the country and is expected to generate 600 highly skilled jobs directly, over 3,000 indirect jobs and an additional 3,000 medium-skill employment opportunities with more than 42.5 lakh man hours of work within the aerospace and defence sector of India,” the defence ministry said.

“It will involve development of specialized infrastructure in form of hangars, buildings, aprons and taxiway. During the process of manufacturing in India, it is expected that all the suppliers of TATA Consortium who will be involved in special processes, will gain and maintain globally recognized National Aerospace and Defence Contractors Accreditation Program (NADCAP) accreditation,”.


                           Jai Hind🇮🇳🇮🇳

Sunday, February 14, 2021

PM Modi Dedicate MBT Arjun tank Mk1-A to Indian Army


In yet another boost for Make in India in defence Prime Minister Narendra Modi will dedicate the Main Battle Tank Arjun Mark1A to the nation on Sunday in Chennai. 

In a high-level meeting, the defence ministry recently cleared the induction of 118 Arjun Mark1A tanks into the Indian Army which would be worth around Rs 8,400 crore and would add to the strength of the force in land warfare.

"Prime Minister Narendra Modi would be dedicating the latest version of the Arjun tank to the nation on February 14 in Chennai at the tank production facility in Avadi," Defence Research and Development Organisation (DRDO) officials told ANI.

The tank has been fully designed and developed by the DRDO in close coordination with the Indian Army. The 118 tanks would be joining the fleet of the first batch of 124 Arjun tanks which have already been inducted into the Army and are deployed in the western desert along the Pakistan front.

The 118 Arjun tanks would also form two regiments in the Armoured Corps of the Indian Army like the first 124 tanks.

Officials said the Army has reduced the number of tanks required for the formation of a tank regiment and that is the why the present order has six lesser tanks than the previous order for two regiments.

The DRDO has been developing the Arjun Mark 1A for quite some time now and the project was hastened by both Chief of Defence Staff Gen Bipin Rawat and DRDO chief Dr G Satheesh Reddy to increase the level of indigenous weapon systems in the armed forces.


The Arjun has been designed by the DRDO's Combat Vehicles Research and Development Establishment (CVRDE) and DRDO Chairman Satheesh Reddy will hand the first Arjun Mark 1A to Prime Minister Modi.

The tanks will be produced by the Ordnance Factory Board's (OFB) Heavy Vehicles Factory (HVF) Avadi. 

The first batch of five main battle tanks will be handed over to the army within two-and-a-half years of the signing of the contract.